Building System: Flat Pack Container House ยท Building Function: Education
Flat Pack Classroom Module
A repeatable classroom shell for schools and training facilities that need planned daylight, teaching layout and expansion.
6055 x 2990 x 2896 mm
4 workers / 2 hours / house
6-8 units / 40HQ
2.3 mm Q235B steel frame
Installation Advantage ยท Factory-prepared frames and enclosure components reduce on-site assembly steps. Review the timed scope.
Patent Documentation Available ยท Confirm applicability for the selected configuration.
Catalog references shown. Final scope follows the quotation and approved specification.
Product Decision Snapshot
What it is
Who it is for
Shown configuration
Main trade-off
Best Fit
- Repeatable teaching rooms in a planned campus
- Industrial training blocks
- Phased school expansion
Not the Best Fit
- Specialist laboratories without a defined equipment brief
- Projects assuming a fixed student count from shell area
- Sites without sanitary and accessibility planning
Product Gallery
Shown Configuration and Layout Logic
| Displayed unit | The displayed configuration is a classroom shell, not a fixed student-capacity promise. Furniture, AV, acoustic treatment, sanitation and specialist equipment are optional scopes. |
|---|---|
| Primary use | General classrooms, theory rooms, instructor rooms and training blocks. |
| Layout and occupancy | Final capacity follows desk layout, accessible routes, egress, ventilation, teaching wall, storage and local education standards. Equipment shown in reference imagery is not automatically included. |
| System behavior | Factory-prepared roof and floor frames, corner posts and enclosure components are packed for site assembly into repeatable room modules. The system favors project blocks and planned combinations over the highest transport density. |
| Final authority | Quotation, approved drawings and approved specification |
Verified Specifications
Company catalog values below apply to the stated system configuration. Where the catalog records more than one dimension or build-up, the quotation must identify the selected model and must not combine conflicting values.
| External / deployed size | 6055 x 2990 x 2896 mm |
|---|---|
| Interior size | 5845 x 2780 x 2500 mm |
| Closed / folded reference | Not applicable |
| Frame | 2.3 mm Q235B steel frame |
| Walls | 50 mm rock wool sandwich panel |
| Roof / ceiling | 50 mm glass wool insulation in the catalog configuration |
| Floor | MGO board or cement fiber board with finish selected by quotation |
| Loading | 6-8 units / 40HQ |
| Installation / deployment | 4 workers / 2 hours / house |
| Wind reference | Catalog reference: wind resistance Level 11 |
| Seismic reference | Catalog reference: anti-seismic Grade 8 |
Configuration Options
Configuration options
- Desk or training-table layout
- Whiteboard and AV provisions
- Additional windows
- Acoustic and insulation choices
- Accessible entrance and sanitary interfaces
Scope and Responsibility Matrix
| Factory Supply | Optional / By Quotation | By Client / Site Contractor |
|---|---|---|
| Structural shell and selected enclosure | Furniture, whiteboard and AV provisions | Foundation and access |
| Quoted windows and internal finishes | Acoustic package | External power, data and sanitary facilities |
| Packing for selected configuration | HVAC and accessible entry | Final testing and education authority approval |
The quotation and approved specification have final authority. Any item not listed as factory supply remains optional or by others.
Installation and Deployment Advantage
Catalog reference: 4 workers / 2 hours / house. The company catalog records 4 workers plus 2 hours for one house. It does not define every included task, so the quotation must state whether wall panels, doors, windows, sealing and lifting are inside the timed scope.
| 1. Site readiness | Foundation or level base, drainage, access and work area complete; weather within the approved installation plan |
|---|---|
| 2. Tools and handling | Quoted hand tools, fasteners, torque/sealant controls and safe lifting or handling equipment confirmed before unloading |
| 3. Timed activity | Main structural assembly reference: 4 workers / 2 hours / house |
| 4. Enclosure completion | Panels, doors, windows and seals only as identified in the timed scope |
| 5. Interior fit-out | Furniture and specialist equipment follow the quotation |
| 6. Utility connection | External networks and final connections by the assigned site party |
| 7. Testing and handover | Inspection, commissioning and local approval after structural deployment |
Structural Innovation and Evidence
Patent-documented structural design
| Patent title | Container Top Panel Lifting Device |
|---|---|
| Patent number | ZL 2025 2 0606066.9 |
| Jurisdiction | China |
| Related structural feature | A lifting device for handling a container top panel during assembly. |
| Procurement relevance | The documented lifting concept supports a more controlled roof-panel handling step when the approved installation plan uses the applicable top-panel arrangement. |
| Status limitation | Utility model patent certificate records grant publication on 17 February 2026; current legal status not independently verified. |
Factory preparation and QC evidence. The company catalog describes automated production and checks including watertightness, penetration, roof load, stacking and side-push testing. The approved inspection and test plan for the order defines the actual hold points, records and acceptance criteria.
Patent documentation is available for review. Current legal status and product-level applicability should be confirmed for the relevant market and configuration.
Applications
General classrooms, theory rooms, instructor rooms and training blocks.
Compare Related Product Configurations
Expandable Classroom Module
Flat Pack Site Office Module
Flat Pack Guest Room Module
Product-Specific FAQ
What is included in the shown flat pack classroom module configuration?
The displayed configuration is a classroom shell, not a fixed student-capacity promise. Furniture, AV, acoustic treatment, sanitation and specialist equipment are optional scopes. The quotation and approved specification are the final scope documents.
How should buyers plan the education layout?
Final capacity follows desk layout, accessible routes, egress, ventilation, teaching wall, storage and local education standards. Equipment shown in reference imagery is not automatically included.
What does the installation or deployment time include?
The company catalog records 4 workers plus 2 hours for one house. It does not define every included task, so the quotation must state whether wall panels, doors, windows, sealing and lifting are inside the timed scope.
Who prepares the foundation and external utility connections?
The client or site contractor normally prepares the foundation, access, unloading plan and external networks unless the quotation assigns a different scope. Review the Camp Installation Responsibilities page before order.
Can dimensions, insulation and fit-out be changed?
Configuration can be reviewed against quantity, destination, climate, layout and use. A change is not included until it appears in the quotation and approved specification.
What information is needed for an accurate quotation?
Provide intended use, quantity, destination, occupancy or floor area, project duration, site and climate conditions, preferred layout, fit-out, utilities, delivery date and available drawings.
Can this unit be relocated?
Relocation depends on the structural system, approved handling method and the condition of frames, panels, fasteners, hinges and seals after use. Reinspection is required before reuse.
Request a Configuration Quote
Share your destination, estimated quantity and basic project requirements. KUBO will review the appropriate configuration, supply scope and next technical inputs.
Confirm the Right Configuration Before Pricing
Use, quantity, destination, layout, occupancy, site conditions and delivery schedule determine the final product configuration and supply boundary.





