Building System: Expandable Container House ยท Building Function: Education
Expandable Classroom Module
A classroom that opens to a wider interior for teaching layouts where one compact transport body must provide more usable width.
Shown reference: 5850 x 6400 x 2510 mm open
4 workers / 30 minutes / house
2 units / 40HQ
Q235 galvanized steel frame
Installation Advantage ยท Factory-prepared frames and enclosure components reduce on-site assembly steps. Review the timed scope.
Patent Documentation Available ยท Confirm applicability for the selected configuration.
Catalog references shown. Final scope follows the quotation and approved specification.
Product Decision Snapshot
What it is
Who it is for
Shown configuration
Main trade-off
Best Fit
- Wider temporary classrooms
- Training rooms
- Sites with limited transport width but larger deployed footprint
Not the Best Fit
- Laboratories without equipment schedules
- Unprepared or uneven sites
- Fixed capacity claims from floor area alone
Product Gallery
Shown Configuration and Layout Logic
| Displayed unit | The page shows an expandable classroom shell. Student capacity, furniture, acoustic performance, AV and sanitation require a project brief. |
|---|---|
| Primary use | General classrooms, training rooms and temporary learning space. |
| Layout and occupancy | Set desk layout, accessible routes, teaching wall, daylight, ventilation, acoustics and egress before assigning capacity. Furniture shown in references is not automatically supplied. |
| System behavior | Side space modules extend from a compact transport body to create a wider interior. Site leveling, support, guide alignment, seals and external utility interfaces must be checked before occupancy. |
| Final authority | Quotation, approved drawings and approved specification |
Verified Specifications
Company catalog values below apply to the stated system configuration. Where the catalog records more than one dimension or build-up, the quotation must identify the selected model and must not combine conflicting values.
| External / deployed size | Shown reference: 5850 x 6400 x 2510 mm open |
|---|---|
| Interior size | Layout depends on partitions and fit-out |
| Closed / folded reference | Shown reference: 5850 x 2200 x 2510 mm closed |
| Frame | Q235 galvanized steel frame |
| Walls | 50 mm EPS or rock wool sandwich panel |
| Roof / ceiling | 50 mm EPS or rock wool sandwich panel |
| Floor | 15 mm fire-protection board plus PVC grain board in catalog |
| Loading | 2 units / 40HQ |
| Installation / deployment | 4 workers / 30 minutes / house |
| Wind reference | Catalog reference: wind speed up to 120 km/h for the listed configuration |
| Seismic reference | Catalog reference: Grade 8 for the listed configuration |
| Alternate Dimensions | The catalog also lists 6234 x 5800 x 2540 mm open and 2200 x 5800 x 2540 mm closed for another configuration. These two dimension sets must not be mixed in one approved specification. |
| Floor Load | Catalog reference: 250 kg/m2 for the listed configuration |
Configuration Options
Configuration options
- Desk or training-table layout
- Whiteboard and AV provision
- Additional windows
- Acoustic treatment
- Accessible entrance and sanitary interfaces
Scope and Responsibility Matrix
| Factory Supply | Optional / By Quotation | By Client / Site Contractor |
|---|---|---|
| Structural shell and selected enclosure | Furniture, whiteboard and AV provisions | Foundation and access |
| Quoted windows and internal finishes | Acoustic package | External power, data and sanitary facilities |
| Packing for selected configuration | HVAC and accessible entry | Final testing and education authority approval |
The quotation and approved specification have final authority. Any item not listed as factory supply remains optional or by others.
Installation and Deployment Advantage
Catalog reference: 4 workers / 30 minutes / house. The company catalog records 4 workers plus 30 minutes for one house. Treat this as unfolding and positioning under prepared conditions, not as foundation, furniture, external utilities, final seals, commissioning or handover.
| 1. Site readiness | Foundation or level base, drainage, access and work area complete; weather within the approved installation plan |
|---|---|
| 2. Tools and handling | Quoted hand tools, fasteners, torque/sealant controls and safe lifting or handling equipment confirmed before unloading |
| 3. Timed activity | Unfolding and deployment reference: 4 workers / 30 minutes / house |
| 4. Enclosure completion | Panels, doors, windows and seals only as identified in the timed scope |
| 5. Interior fit-out | Furniture and specialist equipment follow the quotation |
| 6. Utility connection | External networks and final connections by the assigned site party |
| 7. Testing and handover | Inspection, commissioning and local approval after structural deployment |
Structural Innovation and Evidence
Patent-documented structural design
| Patent title | Heavy-Duty Guide Device for a Space-Retractable Container |
|---|---|
| Patent number | ZL 2023 2 2679320.1 |
| Jurisdiction | China |
| Related structural feature | Upper rail, lower rail and guide sleeve controlling repeated outward movement of an integrated space module. |
| Procurement relevance | The documented guide arrangement addresses stable extension movement and supports factory-prepared interior services where the quoted configuration uses the patented structure. |
| Status limitation | Utility model patent certificate records grant publication on 26 April 2024; current legal status not independently verified. |
Factory preparation and QC evidence. The company catalog describes automated production and checks including watertightness, penetration, roof load, stacking and side-push testing. The approved inspection and test plan for the order defines the actual hold points, records and acceptance criteria.
Patent documentation is available for review. Current legal status and product-level applicability should be confirmed for the relevant market and configuration.
Applications
General classrooms, training rooms and temporary learning space.
Compare Related Product Configurations
Flat Pack Classroom Module
Expandable Clinic and Screening Module
Expandable Retail and Service Kiosk
Product-Specific FAQ
What is included in the shown expandable classroom module configuration?
The page shows an expandable classroom shell. Student capacity, furniture, acoustic performance, AV and sanitation require a project brief. The quotation and approved specification are the final scope documents.
How should buyers plan the education layout?
Set desk layout, accessible routes, teaching wall, daylight, ventilation, acoustics and egress before assigning capacity. Furniture shown in references is not automatically supplied.
What does the installation or deployment time include?
The company catalog records 4 workers plus 30 minutes for one house. Treat this as unfolding and positioning under prepared conditions, not as foundation, furniture, external utilities, final seals, commissioning or handover.
Who prepares the foundation and external utility connections?
The client or site contractor normally prepares the foundation, access, unloading plan and external networks unless the quotation assigns a different scope. Review the Camp Installation Responsibilities page before order.
Can dimensions, insulation and fit-out be changed?
Configuration can be reviewed against quantity, destination, climate, layout and use. A change is not included until it appears in the quotation and approved specification.
What information is needed for an accurate quotation?
Provide intended use, quantity, destination, occupancy or floor area, project duration, site and climate conditions, preferred layout, fit-out, utilities, delivery date and available drawings.
Can this unit be relocated?
Relocation depends on the structural system, approved handling method and the condition of frames, panels, fasteners, hinges and seals after use. Reinspection is required before reuse.
Request a Configuration Quote
Share your destination, estimated quantity and basic project requirements. KUBO will review the appropriate configuration, supply scope and next technical inputs.
Confirm the Right Configuration Before Pricing
Use, quantity, destination, layout, occupancy, site conditions and delivery schedule determine the final product configuration and supply boundary.





