Modular Camp Solutions for Project Sites

Shown configuration ยท final layout and fit-out by quotation.

Building System: Expandable Container House Building Function: Healthcare

Expandable Clinic and Screening Module

A wider deployed shell for screening, consultation, first-aid or temporary clinic layouts defined by a medical equipment and utility brief.

Shown external or deployed size

Shown reference: 5850 x 6400 x 2510 mm open

Unfolding and deployment reference

4 workers / 30 minutes / house

Catalog loading reference

2 units / 40HQ

Structural frame reference

Q235 galvanized steel frame

Installation Advantage ยท Factory-prepared frames and enclosure components reduce on-site assembly steps. Review the timed scope.

Patent Documentation Available ยท Confirm applicability for the selected configuration.

Catalog references shown. Final scope follows the quotation and approved specification.

Product Decision Snapshot

What it is

A wider deployed shell for screening, consultation, first-aid or temporary clinic layouts defined by a medical equipment and utility brief.

Who it is for

Healthcare contractors, emergency planners, NGOs and project medical teams.

Shown configuration

The page presents an expandable healthcare shell. It does not establish BSL classification, hospital licensing or included medical equipment.

Main trade-off

Wider deployed space uses fewer units per 40HQ and needs careful leveling, sealing and expanded-footprint planning.

Best Fit

  • Temporary screening and consultation
  • Project first-aid clinics
  • Wider treatment or waiting layouts

Not the Best Fit

  • Certified isolation without ventilation data
  • Operating theatre or imaging without specialist design
  • Assuming equipment is included

Shown Configuration and Layout Logic

Displayed unitThe page presents an expandable healthcare shell. It does not establish BSL classification, hospital licensing or included medical equipment.
Primary useScreening, consultation, first-aid and non-specialist treatment rooms.
Layout and occupancyDefine patient and staff flow, privacy, handwash points, cleanable finishes, ventilation, medical power, waste and equipment. Isolation performance requires a dedicated engineering brief.
System behaviorSide space modules extend from a compact transport body to create a wider interior. Site leveling, support, guide alignment, seals and external utility interfaces must be checked before occupancy.
Final authorityQuotation, approved drawings and approved specification

Verified Specifications

Company catalog values below apply to the stated system configuration. Where the catalog records more than one dimension or build-up, the quotation must identify the selected model and must not combine conflicting values.

External / deployed sizeShown reference: 5850 x 6400 x 2510 mm open
Interior sizeLayout depends on partitions and fit-out
Closed / folded referenceShown reference: 5850 x 2200 x 2510 mm closed
FrameQ235 galvanized steel frame
Walls50 mm EPS or rock wool sandwich panel
Roof / ceiling50 mm EPS or rock wool sandwich panel
Floor15 mm fire-protection board plus PVC grain board in catalog
Loading2 units / 40HQ
Installation / deployment4 workers / 30 minutes / house
Wind referenceCatalog reference: wind speed up to 120 km/h for the listed configuration
Seismic referenceCatalog reference: Grade 8 for the listed configuration
Alternate DimensionsThe catalog also lists 6234 x 5800 x 2540 mm open and 2200 x 5800 x 2540 mm closed for another configuration. These two dimension sets must not be mixed in one approved specification.
Floor LoadCatalog reference: 250 kg/m2 for the listed configuration

Configuration Options

Configuration options

  • Consultation and waiting zones
  • Handwash and sanitary provision
  • Cleanable finish package
  • Medical power and HVAC interfaces
  • Equipment by client or separate quotation

Scope and Responsibility Matrix

Factory SupplyOptional / By QuotationBy Client / Site Contractor
Structural shell and quoted cleanable finishHVAC and pressure-control engineeringFoundation and access
Quoted plumbing/electrical provisionsMedical power and handwash pointsExternal utilities and clinical waste interfaces
Packing and identificationFurniture and non-specialist fit-outMedical equipment, commissioning and authority approval

The quotation and approved specification have final authority. Any item not listed as factory supply remains optional or by others.

Installation and Deployment Advantage

Catalog reference: 4 workers / 30 minutes / house. The company catalog records 4 workers plus 30 minutes for one house. Treat this as unfolding and positioning under prepared conditions, not as foundation, furniture, external utilities, final seals, commissioning or handover.

1. Site readinessFoundation or level base, drainage, access and work area complete; weather within the approved installation plan
2. Tools and handlingQuoted hand tools, fasteners, torque/sealant controls and safe lifting or handling equipment confirmed before unloading
3. Timed activityUnfolding and deployment reference: 4 workers / 30 minutes / house
4. Enclosure completionPanels, doors, windows and seals only as identified in the timed scope
5. Interior fit-outFurniture and specialist equipment follow the quotation
6. Utility connectionExternal networks and final connections by the assigned site party
7. Testing and handoverInspection, commissioning and local approval after structural deployment

Structural Innovation and Evidence

Patent-documented structural design

Patent titleHeavy-Duty Guide Device for a Space-Retractable Container
Patent numberZL 2023 2 2679320.1
JurisdictionChina
Related structural featureUpper rail, lower rail and guide sleeve controlling repeated outward movement of an integrated space module.
Procurement relevanceThe documented guide arrangement addresses stable extension movement and supports factory-prepared interior services where the quoted configuration uses the patented structure.
Status limitationUtility model patent certificate records grant publication on 26 April 2024; current legal status not independently verified.

Factory preparation and QC evidence. The company catalog describes automated production and checks including watertightness, penetration, roof load, stacking and side-push testing. The approved inspection and test plan for the order defines the actual hold points, records and acceptance criteria.

Patent documentation is available for review. Current legal status and product-level applicability should be confirmed for the relevant market and configuration.

Applications

Screening, consultation, first-aid and non-specialist treatment rooms.

Product-Specific FAQ

The page presents an expandable healthcare shell. It does not establish BSL classification, hospital licensing or included medical equipment. The quotation and approved specification are the final scope documents.

Define patient and staff flow, privacy, handwash points, cleanable finishes, ventilation, medical power, waste and equipment. Isolation performance requires a dedicated engineering brief.

The company catalog records 4 workers plus 30 minutes for one house. Treat this as unfolding and positioning under prepared conditions, not as foundation, furniture, external utilities, final seals, commissioning or handover.

The client or site contractor normally prepares the foundation, access, unloading plan and external networks unless the quotation assigns a different scope. Review the Camp Installation Responsibilities page before order.

Configuration can be reviewed against quantity, destination, climate, layout and use. A change is not included until it appears in the quotation and approved specification.

Provide intended use, quantity, destination, occupancy or floor area, project duration, site and climate conditions, preferred layout, fit-out, utilities, delivery date and available drawings.

Relocation depends on the structural system, approved handling method and the condition of frames, panels, fasteners, hinges and seals after use. Reinspection is required before reuse.

Request a Configuration Quote

Share your destination, estimated quantity and basic project requirements. KUBO will review the appropriate configuration, supply scope and next technical inputs.

KUBO Product Project Quote

Confirm the Right Configuration Before Pricing

Use, quantity, destination, layout, occupancy, site conditions and delivery schedule determine the final product configuration and supply boundary.

Scroll to Top

Get A Free Quote Now !

Contact Form
If you have any questions, please do not hesitate to contact us.
KUBO prefab container house factory overview with modular building production capacity