Building System: Expandable Container House ยท Building Function: Healthcare
Expandable Clinic and Screening Module
A wider deployed shell for screening, consultation, first-aid or temporary clinic layouts defined by a medical equipment and utility brief.
Shown reference: 5850 x 6400 x 2510 mm open
4 workers / 30 minutes / house
2 units / 40HQ
Q235 galvanized steel frame
Installation Advantage ยท Factory-prepared frames and enclosure components reduce on-site assembly steps. Review the timed scope.
Patent Documentation Available ยท Confirm applicability for the selected configuration.
Catalog references shown. Final scope follows the quotation and approved specification.
Product Decision Snapshot
What it is
Who it is for
Shown configuration
Main trade-off
Best Fit
- Temporary screening and consultation
- Project first-aid clinics
- Wider treatment or waiting layouts
Not the Best Fit
- Certified isolation without ventilation data
- Operating theatre or imaging without specialist design
- Assuming equipment is included
Product Gallery
Shown Configuration and Layout Logic
| Displayed unit | The page presents an expandable healthcare shell. It does not establish BSL classification, hospital licensing or included medical equipment. |
|---|---|
| Primary use | Screening, consultation, first-aid and non-specialist treatment rooms. |
| Layout and occupancy | Define patient and staff flow, privacy, handwash points, cleanable finishes, ventilation, medical power, waste and equipment. Isolation performance requires a dedicated engineering brief. |
| System behavior | Side space modules extend from a compact transport body to create a wider interior. Site leveling, support, guide alignment, seals and external utility interfaces must be checked before occupancy. |
| Final authority | Quotation, approved drawings and approved specification |
Verified Specifications
Company catalog values below apply to the stated system configuration. Where the catalog records more than one dimension or build-up, the quotation must identify the selected model and must not combine conflicting values.
| External / deployed size | Shown reference: 5850 x 6400 x 2510 mm open |
|---|---|
| Interior size | Layout depends on partitions and fit-out |
| Closed / folded reference | Shown reference: 5850 x 2200 x 2510 mm closed |
| Frame | Q235 galvanized steel frame |
| Walls | 50 mm EPS or rock wool sandwich panel |
| Roof / ceiling | 50 mm EPS or rock wool sandwich panel |
| Floor | 15 mm fire-protection board plus PVC grain board in catalog |
| Loading | 2 units / 40HQ |
| Installation / deployment | 4 workers / 30 minutes / house |
| Wind reference | Catalog reference: wind speed up to 120 km/h for the listed configuration |
| Seismic reference | Catalog reference: Grade 8 for the listed configuration |
| Alternate Dimensions | The catalog also lists 6234 x 5800 x 2540 mm open and 2200 x 5800 x 2540 mm closed for another configuration. These two dimension sets must not be mixed in one approved specification. |
| Floor Load | Catalog reference: 250 kg/m2 for the listed configuration |
Configuration Options
Configuration options
- Consultation and waiting zones
- Handwash and sanitary provision
- Cleanable finish package
- Medical power and HVAC interfaces
- Equipment by client or separate quotation
Scope and Responsibility Matrix
| Factory Supply | Optional / By Quotation | By Client / Site Contractor |
|---|---|---|
| Structural shell and quoted cleanable finish | HVAC and pressure-control engineering | Foundation and access |
| Quoted plumbing/electrical provisions | Medical power and handwash points | External utilities and clinical waste interfaces |
| Packing and identification | Furniture and non-specialist fit-out | Medical equipment, commissioning and authority approval |
The quotation and approved specification have final authority. Any item not listed as factory supply remains optional or by others.
Installation and Deployment Advantage
Catalog reference: 4 workers / 30 minutes / house. The company catalog records 4 workers plus 30 minutes for one house. Treat this as unfolding and positioning under prepared conditions, not as foundation, furniture, external utilities, final seals, commissioning or handover.
| 1. Site readiness | Foundation or level base, drainage, access and work area complete; weather within the approved installation plan |
|---|---|
| 2. Tools and handling | Quoted hand tools, fasteners, torque/sealant controls and safe lifting or handling equipment confirmed before unloading |
| 3. Timed activity | Unfolding and deployment reference: 4 workers / 30 minutes / house |
| 4. Enclosure completion | Panels, doors, windows and seals only as identified in the timed scope |
| 5. Interior fit-out | Furniture and specialist equipment follow the quotation |
| 6. Utility connection | External networks and final connections by the assigned site party |
| 7. Testing and handover | Inspection, commissioning and local approval after structural deployment |
Structural Innovation and Evidence
Patent-documented structural design
| Patent title | Heavy-Duty Guide Device for a Space-Retractable Container |
|---|---|
| Patent number | ZL 2023 2 2679320.1 |
| Jurisdiction | China |
| Related structural feature | Upper rail, lower rail and guide sleeve controlling repeated outward movement of an integrated space module. |
| Procurement relevance | The documented guide arrangement addresses stable extension movement and supports factory-prepared interior services where the quoted configuration uses the patented structure. |
| Status limitation | Utility model patent certificate records grant publication on 26 April 2024; current legal status not independently verified. |
Factory preparation and QC evidence. The company catalog describes automated production and checks including watertightness, penetration, roof load, stacking and side-push testing. The approved inspection and test plan for the order defines the actual hold points, records and acceptance criteria.
Patent documentation is available for review. Current legal status and product-level applicability should be confirmed for the relevant market and configuration.
Applications
Screening, consultation, first-aid and non-specialist treatment rooms.
Compare Related Product Configurations
Folding First-Aid and Guard Support Module
Detachable Security and Screening Module
Z-Type Folding Emergency Shelter Unit
Product-Specific FAQ
What is included in the shown expandable clinic and screening module configuration?
The page presents an expandable healthcare shell. It does not establish BSL classification, hospital licensing or included medical equipment. The quotation and approved specification are the final scope documents.
How should buyers plan the healthcare layout?
Define patient and staff flow, privacy, handwash points, cleanable finishes, ventilation, medical power, waste and equipment. Isolation performance requires a dedicated engineering brief.
What does the installation or deployment time include?
The company catalog records 4 workers plus 30 minutes for one house. Treat this as unfolding and positioning under prepared conditions, not as foundation, furniture, external utilities, final seals, commissioning or handover.
Who prepares the foundation and external utility connections?
The client or site contractor normally prepares the foundation, access, unloading plan and external networks unless the quotation assigns a different scope. Review the Camp Installation Responsibilities page before order.
Can dimensions, insulation and fit-out be changed?
Configuration can be reviewed against quantity, destination, climate, layout and use. A change is not included until it appears in the quotation and approved specification.
What information is needed for an accurate quotation?
Provide intended use, quantity, destination, occupancy or floor area, project duration, site and climate conditions, preferred layout, fit-out, utilities, delivery date and available drawings.
Can this unit be relocated?
Relocation depends on the structural system, approved handling method and the condition of frames, panels, fasteners, hinges and seals after use. Reinspection is required before reuse.
Request a Configuration Quote
Share your destination, estimated quantity and basic project requirements. KUBO will review the appropriate configuration, supply scope and next technical inputs.
Confirm the Right Configuration Before Pricing
Use, quantity, destination, layout, occupancy, site conditions and delivery schedule determine the final product configuration and supply boundary.





