Building System: Z-Type Folding Container House ยท Building Function: Emergency
Z-Type Folding Emergency Shelter Unit
A compact-folded emergency shelter for pre-positioned stockpiles where one-hour assembly and repeated storage are acceptable.
5900 x 2480 x 2500 mm exterior catalog field
2 workers / 1 hour / house
10 units / 40HQ
2.3 mm Q235B steel frame
Installation Advantage ยท Factory-prepared frames and enclosure components reduce on-site assembly steps. Review the timed scope.
Patent Documentation Available ยท Confirm applicability for the selected configuration.
Catalog references shown. Final scope follows the quotation and approved specification.
Product Decision Snapshot
What it is
Who it is for
Shown configuration
Main trade-off
Best Fit
- Pre-positioned emergency stock
- Temporary relief rooms
- Programs expecting repeat storage
Not the Best Fit
- Fastest possible 10-minute deployment
- Clinical isolation
- Unmaintained long-term storage
Product Gallery
Shown Configuration and Layout Logic
| Displayed unit | The page shows a Z-type emergency shell. Beds, sanitation, HVAC, power and response equipment are separate scopes. |
|---|---|
| Primary use | Temporary shelter, rest, coordination or support space after a documented deployment check. |
| Layout and occupancy | Emergency capacity depends on egress, beds, ventilation, accessibility and welfare requirements. Stockpiled units need periodic inspection and deployment drills. |
| System behavior | A reinforced Z-frame folds into a 440 mm transport height and opens into a full-height module. It is positioned for compact stockholding and repeat deployment where the components remain within inspection limits. |
| Final authority | Quotation, approved drawings and approved specification |
Verified Specifications
Company catalog values below apply to the stated system configuration. Where the catalog records more than one dimension or build-up, the quotation must identify the selected model and must not combine conflicting values.
| External / deployed size | 5900 x 2480 x 2500 mm exterior catalog field |
|---|---|
| Interior size | 5780 x 2280 x 2340 mm |
| Closed / folded reference | Folded height: 440 mm |
| Frame | 2.3 mm Q235B steel frame |
| Walls | 50 mm EPS or rock wool sandwich panel |
| Roof / ceiling | 50 mm sandwich panel with 50 mm glass wool reference |
| Floor | 16 mm MGO or cement fiber board |
| Loading | 10 units / 40HQ |
| Installation / deployment | 2 workers / 1 hour / house |
| Wind reference | Catalog reference: wind speed up to 120 km/h for the listed configuration |
| Seismic reference | Catalog reference: Grade 8 for the listed configuration |
| Dimension Note | A detailed catalog table also shows 5900 x 2480 x 2560 mm. The quotation must resolve the 2500/2560 mm height difference for the selected model. |
Configuration Options
Configuration options
- Sleeping or rest layout
- Power and lighting
- Heating/cooling provision
- Basic furniture
- Separate sanitary modules
Scope and Responsibility Matrix
| Factory Supply | Optional / By Quotation | By Client / Site Contractor |
|---|---|---|
| Structural shell and selected enclosure | Beds and basic furniture | Safe unloading and prepared base |
| Quoted basic lighting or fit-out | Heating/cooling provision | External utilities and sanitary support |
| Packing for storage or transport | Emergency signage and accessories | Response management, testing and authority coordination |
The quotation and approved specification have final authority. Any item not listed as factory supply remains optional or by others.
Installation and Deployment Advantage
Catalog reference: 2 workers / 1 hour / house. The company catalog records 2 workers plus 1 hour for one house. The reference covers the folding structure under prepared conditions and does not include foundations, external utilities, furniture, testing or local approval.
| 1. Site readiness | Foundation or level base, drainage, access and work area complete; weather within the approved installation plan |
|---|---|
| 2. Tools and handling | Quoted hand tools, fasteners, torque/sealant controls and safe lifting or handling equipment confirmed before unloading |
| 3. Timed activity | Main folding-structure assembly reference: 2 workers / 1 hour / house |
| 4. Enclosure completion | Panels, doors, windows and seals only as identified in the timed scope |
| 5. Interior fit-out | Furniture and specialist equipment follow the quotation |
| 6. Utility connection | External networks and final connections by the assigned site party |
| 7. Testing and handover | Inspection, commissioning and local approval after structural deployment |
Structural Innovation and Evidence
Patent-documented structural design
| Patent title | Structural Device for Smooth and Safe Lowering of a Container Side Wall |
|---|---|
| Patent number | ZL 2023 2 1457320.0 |
| Jurisdiction | China |
| Related structural feature | A structural device controlling the lowering motion of a container side wall. |
| Procurement relevance | For an applicable Z-type folding configuration, the documented wall-control concept supports more controlled deployment and pack-down sequencing. |
| Status limitation | Utility model patent certificate records grant publication on 7 November 2023; current legal status not independently verified. |
Factory preparation and QC evidence. The company catalog describes automated production and checks including watertightness, penetration, roof load, stacking and side-push testing. The approved inspection and test plan for the order defines the actual hold points, records and acceptance criteria.
Patent documentation is available for review. Current legal status and product-level applicability should be confirmed for the relevant market and configuration.
Applications
Temporary shelter, rest, coordination or support space after a documented deployment check.
Compare Related Product Configurations
Folding Emergency Shelter Unit
Z-Type Folding Housing Module
Folding First-Aid and Guard Support Module
Product-Specific FAQ
What is included in the shown z-type folding emergency shelter unit configuration?
The page shows a Z-type emergency shell. Beds, sanitation, HVAC, power and response equipment are separate scopes. The quotation and approved specification are the final scope documents.
How should buyers plan the emergency layout?
Emergency capacity depends on egress, beds, ventilation, accessibility and welfare requirements. Stockpiled units need periodic inspection and deployment drills.
What does the installation or deployment time include?
The company catalog records 2 workers plus 1 hour for one house. The reference covers the folding structure under prepared conditions and does not include foundations, external utilities, furniture, testing or local approval.
Who prepares the foundation and external utility connections?
The client or site contractor normally prepares the foundation, access, unloading plan and external networks unless the quotation assigns a different scope. Review the Camp Installation Responsibilities page before order.
Can dimensions, insulation and fit-out be changed?
Configuration can be reviewed against quantity, destination, climate, layout and use. A change is not included until it appears in the quotation and approved specification.
What information is needed for an accurate quotation?
Provide intended use, quantity, destination, occupancy or floor area, project duration, site and climate conditions, preferred layout, fit-out, utilities, delivery date and available drawings.
Can this unit be relocated?
Relocation depends on the structural system, approved handling method and the condition of frames, panels, fasteners, hinges and seals after use. Reinspection is required before reuse.
Request a Configuration Quote
Share your destination, estimated quantity and basic project requirements. KUBO will review the appropriate configuration, supply scope and next technical inputs.
Confirm the Right Configuration Before Pricing
Use, quantity, destination, layout, occupancy, site conditions and delivery schedule determine the final product configuration and supply boundary.





