Modular Camp Solutions for Project Sites

Shown configuration ยท final layout and fit-out by quotation.

Building System: Detachable Flat Pack Container House Building Function: Security / Support

Detachable Security and Screening Module

A compact public-facing module configured either as a security booth or as a basic screening and first-aid room.

Shown external or deployed size

6000 x 3000 x 2840 mm

Main structural assembly reference

4 workers / 3 hours / house

Catalog loading reference

17 units / 40HQ

Structural frame reference

Hot-dip galvanized prefabricated profiles; 2.3 mm Q235B frame reference

Installation Advantage ยท Factory-prepared frames and enclosure components reduce on-site assembly steps. Review the timed scope.

Patent Documentation Available ยท Confirm applicability for the selected configuration.

Catalog references shown. Final scope follows the quotation and approved specification.

Product Decision Snapshot

What it is

A compact public-facing module configured either as a security booth or as a basic screening and first-aid room.

Who it is for

Site security managers, contractors and public-service teams needing a small controlled-access module.

Shown configuration

The exterior shown supports a compact service module. The quotation selects security or basic medical-screening layout and defines counters, sinks, power, ventilation and privacy.

Main trade-off

Excellent shipping density, but more organized component staging and assembly labor than folding deployment.

Best Fit

  • Access control and guard rooms
  • Screening or first-aid rooms
  • Distributed public-service points

Not the Best Fit

  • Full clinical care without a medical brief
  • Combining guard and treatment functions in one small room
  • High-security certification not defined in the quotation

Shown Configuration and Layout Logic

Displayed unitThe exterior shown supports a compact service module. The quotation selects security or basic medical-screening layout and defines counters, sinks, power, ventilation and privacy.
Primary useGuarding, access control and screening. Clinic use is an alternative fit-out, not a simultaneous default.
Layout and occupancySecurity flow needs sightlines and controlled access. Medical use needs cleanable finishes, privacy, handwashing and equipment exclusions. Specialist treatment equipment is by the client unless quoted.
System behaviorRoof, floor, corner and panel components are produced as a knock-down kit. Standardized modules can be used alone or combined, with stacking subject to structural review, access, fire strategy and local approval.
Final authorityQuotation, approved drawings and approved specification

Verified Specifications

Company catalog values below apply to the stated system configuration. Where the catalog records more than one dimension or build-up, the quotation must identify the selected model and must not combine conflicting values.

External / deployed size6000 x 3000 x 2840 mm
Interior size5680 x 2680 x 2520 mm
Closed / folded referenceNot applicable
FrameHot-dip galvanized prefabricated profiles; 2.3 mm Q235B frame reference
Walls75 mm rock wool composite panel; 50/100 mm options in catalog
Roof / ceiling100 mm glass wool roof insulation in the detailed catalog configuration
Floor18 mm MGO board or cement fiber board
Loading17 units / 40HQ
Installation / deployment4 workers / 3 hours / house
Wind referenceCatalog lists project engineering fields; final wind requirement is quotation-specific
Seismic referenceCatalog product overview references seismic performance; destination requirement must be confirmed

Configuration Options

Configuration options

  • Security counter and service window
  • Privacy partition
  • Handwash provision
  • Extra glazing or security bar
  • Medical furniture and equipment by others

Scope and Responsibility Matrix

Factory SupplyOptional / By QuotationBy Client / Site Contractor
Structural shell and selected enclosureHandwash and HVAC provisionsFoundation and controlled access
Quoted partitions, glazing or counterSecurity fixturesExternal power, data, water or drainage
Packing and component identificationFurniture and specialist fit-outSpecialist equipment, testing and authority approval

The quotation and approved specification have final authority. Any item not listed as factory supply remains optional or by others.

Installation and Deployment Advantage

Catalog reference: 4 workers / 3 hours / house. The company catalog records 4 workers plus 3 hours for one house. Foundation readiness, unloading, final utility connection, fit-out, testing and handover sit outside that headline unless the approved quotation says otherwise.

1. Site readinessFoundation or level base, drainage, access and work area complete; weather within the approved installation plan
2. Tools and handlingQuoted hand tools, fasteners, torque/sealant controls and safe lifting or handling equipment confirmed before unloading
3. Timed activityMain structural assembly reference: 4 workers / 3 hours / house
4. Enclosure completionPanels, doors, windows and seals only as identified in the timed scope
5. Interior fit-outFurniture and specialist equipment follow the quotation
6. Utility connectionExternal networks and final connections by the assigned site party
7. Testing and handoverInspection, commissioning and local approval after structural deployment

Structural Innovation and Evidence

Patent-documented structural design

Patent titleHighly Integrated System and Rapid Assembly Container
Patent numberZL 2023 2 2540156.6
JurisdictionChina
Related structural featureModular roof, floor, post and corner assemblies designed for transport and bolted assembly without welding.
Procurement relevanceThe documented corner-assembly arrangement addresses repeatability, transport packing and site assembly control for detachable kits.
Status limitationUtility model patent certificate records grant publication on 7 June 2024; current legal status not independently verified.

Factory preparation and QC evidence. The company catalog describes automated production and checks including watertightness, penetration, roof load, stacking and side-push testing. The approved inspection and test plan for the order defines the actual hold points, records and acceptance criteria.

Patent documentation is available for review. Current legal status and product-level applicability should be confirmed for the relevant market and configuration.

Applications

Guarding, access control and screening. Clinic use is an alternative fit-out, not a simultaneous default.

Product-Specific FAQ

The exterior shown supports a compact service module. The quotation selects security or basic medical-screening layout and defines counters, sinks, power, ventilation and privacy. The quotation and approved specification are the final scope documents.

Security flow needs sightlines and controlled access. Medical use needs cleanable finishes, privacy, handwashing and equipment exclusions. Specialist treatment equipment is by the client unless quoted.

The company catalog records 4 workers plus 3 hours for one house. Foundation readiness, unloading, final utility connection, fit-out, testing and handover sit outside that headline unless the approved quotation says otherwise.

The client or site contractor normally prepares the foundation, access, unloading plan and external networks unless the quotation assigns a different scope. Review the Camp Installation Responsibilities page before order.

Configuration can be reviewed against quantity, destination, climate, layout and use. A change is not included until it appears in the quotation and approved specification.

Provide intended use, quantity, destination, occupancy or floor area, project duration, site and climate conditions, preferred layout, fit-out, utilities, delivery date and available drawings.

Relocation depends on the structural system, approved handling method and the condition of frames, panels, fasteners, hinges and seals after use. Reinspection is required before reuse.

Request a Configuration Quote

Share your destination, estimated quantity and basic project requirements. KUBO will review the appropriate configuration, supply scope and next technical inputs.

KUBO Product Project Quote

Confirm the Right Configuration Before Pricing

Use, quantity, destination, layout, occupancy, site conditions and delivery schedule determine the final product configuration and supply boundary.

Scroll to Top

Get A Free Quote Now !

Contact Form
If you have any questions, please do not hesitate to contact us.
KUBO prefab container house factory overview with modular building production capacity