Building System: Folding Container House ยท Building Function: Accommodation
Folding Worker Dormitory Unit
A rapidly deployed sleeping module for temporary camp phases where accommodation must follow changing work fronts.
5800 x 2480 x 2560 mm
2 workers / 10 minutes / house
10-12 units / 40HQ
2.3 mm Q235B steel frame
Installation Advantage ยท Factory-prepared frames and enclosure components reduce on-site assembly steps. Review the timed scope.
Patent Documentation Available ยท Confirm applicability for the selected configuration.
Catalog references shown. Final scope follows the quotation and approved specification.
Product Decision Snapshot
What it is
Who it is for
Shown configuration
Main trade-off
Best Fit
- Rapid camp mobilization
- Temporary worker rooms
- Relocatable project phases
Not the Best Fit
- Long-stay high-finish accommodation
- Fixed occupancy without layout review
- Combined dormitory and sanitary functions in one undivided room
Product Gallery
Shown Configuration and Layout Logic
| Displayed unit | The page shows a folding accommodation shell. Occupancy, beds, lockers, HVAC and sanitary strategy are not fixed by the product name. |
|---|---|
| Primary use | Temporary workforce sleeping rooms supported by separate sanitary and welfare modules. |
| Layout and occupancy | Set bed count from aisle, egress, ventilation, privacy and welfare requirements. Repeated folding needs inspection before another deployment cycle. |
| System behavior | Roof, floor and wall elements fold into a compact transport package and are raised into the deployed enclosure. The fast step is structural deployment; site readiness and post-deployment completion remain separate work packages. |
| Final authority | Quotation, approved drawings and approved specification |
Verified Specifications
Company catalog values below apply to the stated system configuration. Where the catalog records more than one dimension or build-up, the quotation must identify the selected model and must not combine conflicting values.
| External / deployed size | 5800 x 2480 x 2560 mm |
|---|---|
| Interior size | 5650 x 2280 x 2360 mm |
| Closed / folded reference | Folded transport height depends on quoted folding arrangement |
| Frame | 2.3 mm Q235B steel frame |
| Walls | 50 mm EPS or rock wool sandwich panel |
| Roof / ceiling | 50 mm sandwich panel with 50 mm glass wool reference |
| Floor | 16 mm MGO or cement fiber board |
| Loading | 10-12 units / 40HQ |
| Installation / deployment | 2 workers / 10 minutes / house |
| Wind reference | Catalog reference: wind speed up to 120 km/h for the listed configuration |
| Seismic reference | Catalog reference: Grade 8 for the listed configuration |
Configuration Options
Configuration options
- Bunk or single beds
- Lockers and privacy curtains
- HVAC and local voltage
- Interior finish
- Separate sanitary module coordination
Scope and Responsibility Matrix
| Factory Supply | Optional / By Quotation | By Client / Site Contractor |
|---|---|---|
| Structural shell and selected enclosure | Beds, lockers and privacy items | Foundation, unloading and lifting |
| Factory-installed items listed in approved specification | HVAC and local-voltage electrical package | External power, water and drainage |
| Packing for confirmed shipment plan | Private sanitary fit-out | Final connections, testing, permits and occupancy approval |
The quotation and approved specification have final authority. Any item not listed as factory supply remains optional or by others.
Installation and Deployment Advantage
Catalog reference: 2 workers / 10 minutes / house. The company catalog records 2 workers plus 10 minutes for one house. Use it as the folding/unfolding reference under prepared conditions. It excludes foundation work, unloading strategy, furniture, external utilities, final connections, testing and handover.
| 1. Site readiness | Foundation or level base, drainage, access and work area complete; weather within the approved installation plan |
|---|---|
| 2. Tools and handling | Quoted hand tools, fasteners, torque/sealant controls and safe lifting or handling equipment confirmed before unloading |
| 3. Timed activity | Unfolding and deployment reference: 2 workers / 10 minutes / house |
| 4. Enclosure completion | Panels, doors, windows and seals only as identified in the timed scope |
| 5. Interior fit-out | Furniture and specialist equipment follow the quotation |
| 6. Utility connection | External networks and final connections by the assigned site party |
| 7. Testing and handover | Inspection, commissioning and local approval after structural deployment |
Structural Innovation and Evidence
Patent-documented structural design
| Patent title | Structural Device for Smooth and Safe Lowering of a Container Side Wall |
|---|---|
| Patent number | ZL 2023 2 1457320.0 |
| Jurisdiction | China |
| Related structural feature | A structural device controlling the lowering motion of a container side wall. |
| Procurement relevance | For applicable folding configurations, the documented mechanism addresses controlled wall movement during deployment and pack-down. |
| Status limitation | Utility model patent certificate records grant publication on 7 November 2023; current legal status not independently verified. |
Factory preparation and QC evidence. The company catalog describes automated production and checks including watertightness, penetration, roof load, stacking and side-push testing. The approved inspection and test plan for the order defines the actual hold points, records and acceptance criteria.
Patent documentation is available for review. Current legal status and product-level applicability should be confirmed for the relevant market and configuration.
Applications
Temporary workforce sleeping rooms supported by separate sanitary and welfare modules.
Compare Related Product Configurations
Flat Pack Worker Dormitory Module
Detachable Dormitory Module
Z-Type Folding Housing Module
Product-Specific FAQ
What is included in the shown folding worker dormitory unit configuration?
The page shows a folding accommodation shell. Occupancy, beds, lockers, HVAC and sanitary strategy are not fixed by the product name. The quotation and approved specification are the final scope documents.
How should buyers plan the accommodation layout?
Set bed count from aisle, egress, ventilation, privacy and welfare requirements. Repeated folding needs inspection before another deployment cycle.
What does the installation or deployment time include?
The company catalog records 2 workers plus 10 minutes for one house. Use it as the folding/unfolding reference under prepared conditions. It excludes foundation work, unloading strategy, furniture, external utilities, final connections, testing and handover.
Who prepares the foundation and external utility connections?
The client or site contractor normally prepares the foundation, access, unloading plan and external networks unless the quotation assigns a different scope. Review the Camp Installation Responsibilities page before order.
Can dimensions, insulation and fit-out be changed?
Configuration can be reviewed against quantity, destination, climate, layout and use. A change is not included until it appears in the quotation and approved specification.
What information is needed for an accurate quotation?
Provide intended use, quantity, destination, occupancy or floor area, project duration, site and climate conditions, preferred layout, fit-out, utilities, delivery date and available drawings.
Can this unit be relocated?
Relocation depends on the structural system, approved handling method and the condition of frames, panels, fasteners, hinges and seals after use. Reinspection is required before reuse.
Request a Configuration Quote
Share your destination, estimated quantity and basic project requirements. KUBO will review the appropriate configuration, supply scope and next technical inputs.
Confirm the Right Configuration Before Pricing
Use, quantity, destination, layout, occupancy, site conditions and delivery schedule determine the final product configuration and supply boundary.





