Building System: Detachable Container House ยท Building Function: Hospitality
Detachable Guest Accommodation Module
A relocatable guest-room shell for hospitality and project lodging programs with repeatable room planning.
5950 x 3000 x 2800 mm
4 workers / 3 hours / house
17 units / 40HQ; 7 units / 20GP
Hot-dip galvanized prefabricated profiles; 2.3 mm Q235B frame reference
Installation Advantage ยท Factory-prepared frames and enclosure components reduce on-site assembly steps. Review the timed scope.
Patent Documentation Available ยท Confirm applicability for the selected configuration.
Catalog references shown. Final scope follows the quotation and approved specification.
Product Decision Snapshot
What it is
Who it is for
Shown configuration
Main trade-off
Best Fit
- Repeatable guest rooms
- Project lodging that may relocate
- Phased hospitality expansion
Not the Best Fit
- A complete resort scope from one module
- Unverified luxury finish assumptions
- Relocation without reinspection
Product Gallery
Shown Configuration and Layout Logic
| Displayed unit | The page shows an accommodation module. Bathroom, furniture, faรงade, MEP, corridor and public-space packages are optional or separate. |
|---|---|
| Primary use | Guest rooms, staff lodging and repeatable room wings where later dismantling may be considered. |
| Layout and occupancy | Define bed type, bathroom, storage, luggage, housekeeping, accessibility and corridor strategy. Reuse after dismantling depends on inspection and component condition. |
| System behavior | Prefabricated frame, panel and utility-routing components are shipped as a detachable kit. The system is intended for repeatable assembly, dismantling and later transfer when the approved component condition permits reuse. |
| Final authority | Quotation, approved drawings and approved specification |
Verified Specifications
Company catalog values below apply to the stated system configuration. Where the catalog records more than one dimension or build-up, the quotation must identify the selected model and must not combine conflicting values.
| External / deployed size | 5950 x 3000 x 2800 mm |
|---|---|
| Interior size | 5630 x 2680 x 2480 mm |
| Closed / folded reference | Not applicable |
| Frame | Hot-dip galvanized prefabricated profiles; 2.3 mm Q235B frame reference |
| Walls | 75 mm rock wool composite panel; 50/100 mm options in catalog |
| Roof / ceiling | 50/100 mm glass wool roof insulation options in catalog |
| Floor | 18 mm MGO board or cement fiber board |
| Loading | 17 units / 40HQ; 7 units / 20GP |
| Installation / deployment | 4 workers / 3 hours / house |
| Wind reference | Catalog configuration references weather resistance; design action is project-specific |
| Seismic reference | Catalog product overview references seismic performance; final design is project-specific |
Configuration Options
Configuration options
- Single or twin room
- Private bathroom by quotation
- Interior finish package
- Faรงade and glazing
- Furniture, HVAC and appliances
Scope and Responsibility Matrix
| Factory Supply | Optional / By Quotation | By Client / Site Contractor |
|---|---|---|
| Structural shell and selected enclosure | Bathroom, furniture and appliances | Foundation, corridors and access |
| Quoted interior/MEP rough-ins | Faรงade and finish package | External utilities and public areas |
| Packing for approved room data sheet | HVAC and controls | Final commissioning and hospitality approval |
The quotation and approved specification have final authority. Any item not listed as factory supply remains optional or by others.
Installation and Deployment Advantage
Catalog reference: 4 workers / 3 hours / house. The company catalog records no-welding assembly and 4 workers plus 3 hours for one house. The timed reference does not automatically include unloading, foundation work, external networks, final MEP connection, furniture, testing or statutory approval.
| 1. Site readiness | Foundation or level base, drainage, access and work area complete; weather within the approved installation plan |
|---|---|
| 2. Tools and handling | Quoted hand tools, fasteners, torque/sealant controls and safe lifting or handling equipment confirmed before unloading |
| 3. Timed activity | Main structural assembly reference: 4 workers / 3 hours / house |
| 4. Enclosure completion | Panels, doors, windows and seals only as identified in the timed scope |
| 5. Interior fit-out | Furniture and specialist equipment follow the quotation |
| 6. Utility connection | External networks and final connections by the assigned site party |
| 7. Testing and handover | Inspection, commissioning and local approval after structural deployment |
Structural Innovation and Evidence
Patent-documented structural design
| Patent title | Container Bottom Frame Structure Suitable for Forklift Handling |
|---|---|
| Patent number | ZL 2023 2 2679306.1 |
| Jurisdiction | China |
| Related structural feature | Reinforced bottom-frame channels aligned with forklift openings for controlled handling. |
| Procurement relevance | Where the quoted unit uses this bottom-frame arrangement, it can support planned forklift handling while addressing frame stability around the fork openings. |
| Status limitation | Utility model patent certificate records grant publication on 18 June 2024; current legal status not independently verified. |
Factory preparation and QC evidence. The company catalog describes automated production and checks including watertightness, penetration, roof load, stacking and side-push testing. The approved inspection and test plan for the order defines the actual hold points, records and acceptance criteria.
Patent documentation is available for review. Current legal status and product-level applicability should be confirmed for the relevant market and configuration.
Applications
Guest rooms, staff lodging and repeatable room wings where later dismantling may be considered.
Compare Related Product Configurations
Flat Pack Guest Room Module
Detachable Dormitory Module
Z-Type Folding Housing Module
Product-Specific FAQ
What is included in the shown detachable guest accommodation module configuration?
The page shows an accommodation module. Bathroom, furniture, faรงade, MEP, corridor and public-space packages are optional or separate. The quotation and approved specification are the final scope documents.
How should buyers plan the hospitality layout?
Define bed type, bathroom, storage, luggage, housekeeping, accessibility and corridor strategy. Reuse after dismantling depends on inspection and component condition.
What does the installation or deployment time include?
The company catalog records no-welding assembly and 4 workers plus 3 hours for one house. The timed reference does not automatically include unloading, foundation work, external networks, final MEP connection, furniture, testing or statutory approval.
Who prepares the foundation and external utility connections?
The client or site contractor normally prepares the foundation, access, unloading plan and external networks unless the quotation assigns a different scope. Review the Camp Installation Responsibilities page before order.
Can dimensions, insulation and fit-out be changed?
Configuration can be reviewed against quantity, destination, climate, layout and use. A change is not included until it appears in the quotation and approved specification.
What information is needed for an accurate quotation?
Provide intended use, quantity, destination, occupancy or floor area, project duration, site and climate conditions, preferred layout, fit-out, utilities, delivery date and available drawings.
Can this unit be relocated?
Relocation depends on the structural system, approved handling method and the condition of frames, panels, fasteners, hinges and seals after use. Reinspection is required before reuse.
Request a Configuration Quote
Share your destination, estimated quantity and basic project requirements. KUBO will review the appropriate configuration, supply scope and next technical inputs.
Confirm the Right Configuration Before Pricing
Use, quantity, destination, layout, occupancy, site conditions and delivery schedule determine the final product configuration and supply boundary.





