Building System: Detachable Flat Pack Container House ยท Building Function: Storage
Detachable Flat Pack Equipment Storage Module
A dry project store for tools, consumables and maintenance stock that need compact export and a defined access plan.
6000 x 3000 x 2840 mm
4 workers / 3 hours / house
17 units / 40HQ
Hot-dip galvanized prefabricated profiles; 2.3 mm Q235B frame reference
Installation Advantage ยท Factory-prepared frames and enclosure components reduce on-site assembly steps. Review the timed scope.
Patent Documentation Available ยท Confirm applicability for the selected configuration.
Catalog references shown. Final scope follows the quotation and approved specification.
Product Decision Snapshot
What it is
Who it is for
Shown configuration
Main trade-off
Best Fit
- Dry tools and consumables
- Distributed maintenance stores
- Bulk-export project support modules
Not the Best Fit
- Hazardous-material storage without a code brief
- Heavy equipment beyond confirmed floor load
- Cold storage or controlled atmosphere
Product Gallery
Shown Configuration and Layout Logic
| Displayed unit | The displayed module is a light-duty enclosed store. Rack loads, hazardous goods, batteries, chemicals, heavy machinery and fire segregation require separate engineering. |
|---|---|
| Primary use | Light equipment, tools, spares and controlled project supplies. |
| Layout and occupancy | Plan door width, aisle clearances, racking, floor load, ventilation, lighting, security and inventory handling. The shell is not automatically a dangerous-goods store. |
| System behavior | Roof, floor, corner and panel components are produced as a knock-down kit. Standardized modules can be used alone or combined, with stacking subject to structural review, access, fire strategy and local approval. |
| Final authority | Quotation, approved drawings and approved specification |
Verified Specifications
Company catalog values below apply to the stated system configuration. Where the catalog records more than one dimension or build-up, the quotation must identify the selected model and must not combine conflicting values.
| External / deployed size | 6000 x 3000 x 2840 mm |
|---|---|
| Interior size | 5680 x 2680 x 2520 mm |
| Closed / folded reference | Not applicable |
| Frame | Hot-dip galvanized prefabricated profiles; 2.3 mm Q235B frame reference |
| Walls | 75 mm rock wool composite panel; 50/100 mm options in catalog |
| Roof / ceiling | 100 mm glass wool roof insulation in the detailed catalog configuration |
| Floor | 18 mm MGO board or cement fiber board |
| Loading | 17 units / 40HQ |
| Installation / deployment | 4 workers / 3 hours / house |
| Wind reference | Catalog lists project engineering fields; final wind requirement is quotation-specific |
| Seismic reference | Catalog product overview references seismic performance; destination requirement must be confirmed |
Configuration Options
Configuration options
- Shelving and rack interface
- Double door or roller access by quotation
- Ventilation and lighting
- Security grilles
- Internal separation
Scope and Responsibility Matrix
| Factory Supply | Optional / By Quotation | By Client / Site Contractor |
|---|---|---|
| Structural shell and selected enclosure | Shelving and racks | Foundation and unloading |
| Quoted doors, ventilation and lighting | Security and access package | Material handling and external power |
| Packing and component identification | Electrical and ventilation upgrades | Load plan, fire strategy and local approval |
The quotation and approved specification have final authority. Any item not listed as factory supply remains optional or by others.
Installation and Deployment Advantage
Catalog reference: 4 workers / 3 hours / house. The company catalog records 4 workers plus 3 hours for one house. Foundation readiness, unloading, final utility connection, fit-out, testing and handover sit outside that headline unless the approved quotation says otherwise.
| 1. Site readiness | Foundation or level base, drainage, access and work area complete; weather within the approved installation plan |
|---|---|
| 2. Tools and handling | Quoted hand tools, fasteners, torque/sealant controls and safe lifting or handling equipment confirmed before unloading |
| 3. Timed activity | Main structural assembly reference: 4 workers / 3 hours / house |
| 4. Enclosure completion | Panels, doors, windows and seals only as identified in the timed scope |
| 5. Interior fit-out | Furniture and specialist equipment follow the quotation |
| 6. Utility connection | External networks and final connections by the assigned site party |
| 7. Testing and handover | Inspection, commissioning and local approval after structural deployment |
Structural Innovation and Evidence
Patent-documented structural design
| Patent title | Highly Integrated System and Rapid Assembly Container |
|---|---|
| Patent number | ZL 2023 2 2540156.6 |
| Jurisdiction | China |
| Related structural feature | Modular roof, floor, post and corner assemblies designed for transport and bolted assembly without welding. |
| Procurement relevance | The documented corner-assembly arrangement addresses repeatability, transport packing and site assembly control for detachable kits. |
| Status limitation | Utility model patent certificate records grant publication on 7 June 2024; current legal status not independently verified. |
Factory preparation and QC evidence. The company catalog describes automated production and checks including watertightness, penetration, roof load, stacking and side-push testing. The approved inspection and test plan for the order defines the actual hold points, records and acceptance criteria.
Patent documentation is available for review. Current legal status and product-level applicability should be confirmed for the relevant market and configuration.
Applications
Light equipment, tools, spares and controlled project supplies.
Compare Related Product Configurations
Expandable Warehouse Module
Z-Type Folding Storage Module
Detachable Flat Pack Camp Support Module
Product-Specific FAQ
What is included in the shown detachable flat pack equipment storage module configuration?
The displayed module is a light-duty enclosed store. Rack loads, hazardous goods, batteries, chemicals, heavy machinery and fire segregation require separate engineering. The quotation and approved specification are the final scope documents.
How should buyers plan the storage layout?
Plan door width, aisle clearances, racking, floor load, ventilation, lighting, security and inventory handling. The shell is not automatically a dangerous-goods store.
What does the installation or deployment time include?
The company catalog records 4 workers plus 3 hours for one house. Foundation readiness, unloading, final utility connection, fit-out, testing and handover sit outside that headline unless the approved quotation says otherwise.
Who prepares the foundation and external utility connections?
The client or site contractor normally prepares the foundation, access, unloading plan and external networks unless the quotation assigns a different scope. Review the Camp Installation Responsibilities page before order.
Can dimensions, insulation and fit-out be changed?
Configuration can be reviewed against quantity, destination, climate, layout and use. A change is not included until it appears in the quotation and approved specification.
What information is needed for an accurate quotation?
Provide intended use, quantity, destination, occupancy or floor area, project duration, site and climate conditions, preferred layout, fit-out, utilities, delivery date and available drawings.
Can this unit be relocated?
Relocation depends on the structural system, approved handling method and the condition of frames, panels, fasteners, hinges and seals after use. Reinspection is required before reuse.
Request a Configuration Quote
Share your destination, estimated quantity and basic project requirements. KUBO will review the appropriate configuration, supply scope and next technical inputs.
Confirm the Right Configuration Before Pricing
Use, quantity, destination, layout, occupancy, site conditions and delivery schedule determine the final product configuration and supply boundary.





