Workforce Camp Planning FAQ
Does a two-shift project need fewer accommodation beds?
Not under the default planning method. Each project resident still needs accommodation capacity. Two-shift operation only reduces the preliminary peak population used to discuss shared facilities. A hot-bunking arrangement would require a separate, explicitly approved operating model.
How should senior staff and workers be separated in camp planning?
Separate occupancy standards can be applied to senior, supervisory and worker groups. The final zoning should then consider privacy, walking routes, management access, dining arrangements, sanitary facilities, security and the client's accommodation policy.
How much spare accommodation capacity should a project camp include?
The suitable allowance depends on mobilisation uncertainty, turnover, visitors, isolation needs, phased workforce changes and expansion plans. This tool provides 0%, 5%, 10%, 15% and a custom 0–50% option so the assumption remains visible.
Can KUBO calculate dining, kitchen and sanitary buildings as part of the camp?
KUBO can review those facilities as part of a wider camp brief. Their final quantities require information such as meal periods, service model, local sanitary rules, workforce mix, shift peaks, utility conditions and client standards; this first calculator therefore presents a checklist rather than unsupported quantities.
How is the number of modular units determined from the room requirement?
Room counts are rounded up by workforce group. The first version then uses an editable planning assumption of two rooms per accommodation module for every group. This is not a confirmed KUBO engineering standard and must be calibrated against the selected floor plan and module dimensions.
Can the calculator be used for mining and EPC project camps?
Yes, it can support early capacity discussions for mining, energy, infrastructure, construction and EPC projects. The result remains preliminary because project location, climate, logistics, specifications and operating requirements can change the final configuration.
What information is required before KUBO prepares a detailed camp layout?
Provide workforce numbers and hierarchy, room occupancy, project location, available site size, climate, duration, utility basis, required supporting facilities, applicable specifications and known delivery or construction constraints.
Can the camp be expanded later if workforce numbers increase?
Expansion can be considered during planning, but it depends on the selected building system, site circulation, utility capacity, fire access, structural interfaces, foundations and logistics. Reserve future zones and connection points before the initial layout is frozen.